Ar

Hire of equipments

Article 12 : The hire of equipment outside normal port handling operations by shipping agent or receiver, is based on the following table no. 4.
 

Table no. 4- Hire of equipment for outside normal port handling operations.

Reference 

Description of operation

Unit

Old price $

New price $

EQ3

Forklift less than  3 tons / or Bobcat on quay or in yard

Hour

15

18

EN3

Forklift less than  3 tons / or Bobcat inside vessel’s hold 

Hour

19

23

EQ5

Forklift less than  5 tons on quay or in yard

Hour

20

24

EN5

Forklift less than  5 tons inside vessel’s hold

Hour

25

30

EQ10

Forklift  less than  10 tons on quay or in yard

Hour

25

30

EN10

Forklift  less than 10 tons inside vessel’s hold

Hour

30

36

EAQ10

Forklift less than 10 tons with grab on quay

Hour

30

36

EAN10

Forklift less than 10 tons with grab in vessel’s hold

Hour

35

42

EQ20

Forklift from 10 to 20 tons on quay

Hour

35

42

EN20

Forklift from 10 to 20 tons in vessel’s hold

Hour

40

48

EQ40

Forklift from  20 to 40 tons on quay

Hour

80

96

EN40

Forklift from 20 to 40 tons in vessel’s hold

Hour

100

120

PQ1

Excavator on quay

Hour

50

60

PN1

Excavator  in vessel’s hold

Hour

75

90

PW1

Excavator for bulk  in warehouse

Ton

-

1.75

CC1

Tank truck for fresh water

Trip

48

60

TRV

Transportation cost of cars to warehouses

Cars

2

3

CMQ

Truck to Transport for general cargoes (quay and warehouses)

Trip

20

24

CMN

Truck to Transport  general cargoes from/to Ro/Ro vessels   

Trip

25

30

RMQ

Trailer with load limit up to 40 tons

Hour

15

18

BM1

grab for grains and bulky materials

Ton

1

1.2

GM50

Mobile crane  less than  50 (load up to 6 tons)

Hour

44

58

GM90

Mobile crane from 50 to 89 tons (load from 6 up to 15 tons)

Hour

66

80

GM140

Mobile crane from 90 up to 120 tons (load from 15 up to 25 tons)

Hour

66

100

GM165

Mobile crane from 140 up to 165 tons (load from 25 up to 35 tons)

Hour

88

115

GM300

Mobile crane from 166 tons and over (load over 36 tons)

Hour

132

172



Article 13: The following remarks should be taken into consideration when is applied article 12 (table no. 4):
  • If work requested by agent on Sundays or official holiday is not cancelled by 12.00 noon on the last working day before the holiday, Port management will charge two hours hire for each equipment ordered.
  • Hiring of equipment is based on the exact hours used, with a minimum of two hours hire for each equipment ordered.
  • Loading & discharging of hired equipment in ship’s holds are considered as two completed operations and calculated on the basis.
  • When using mobile cranes (GM165, GM300) for discharging or loading, the used effective worked hours are calculated as per table no. 4 or on weight as per tables no. 3-A and 3-B, whichever is more profitable for the port.
  • Each equipment brought up from outside the port (after getting the management’s approval), to operate temporarily inside the port or on the deck of the ship, for the account of a shipping agent or receiver, requires from concerned parties the settlement of a lump sum fee of 100$ per day or part thereof.
© 2024 Port of Beirut. All Rights Reserved. | Privacy Policy